General Arrangement view of Tiaano’s Chemical Free Electrolytic Scale Remover (Fully Automatic)

November 6, 2019 at 1:40 PMadmin
The General Arrangement View of Automatic ElSr with full Instrumentation (Tiaano ElSr – SC / A) is self-explanatory on its operation. [More]

Images of Tiaano’s Chemical Free Electrolytic Scale Remover at Bangalore, India.

November 4, 2019 at 10:41 AMadmin
Tiaano installed their Chemical Free Electrolytic Scale Remover (ElSr) at Bangalore for the larger capacity cooling tower of 4800 TR (4 X 1200 TR) for HVAC application. From the stage of installation, our ElSr system is performing well. [More]

Chemical Free Self- Cleaning ElSr unit with the additional facility of Global Data Monitoring (E-surveyor)

October 26, 2019 at 5:33 PMadmin
E-surveyor is used to monitor process variables and predict final product quality at an early stage, while also providing the better understanding of the process. This allows engineers and production managers to optimize their processes, thereby realizing significant cost and time savings. [More]

Posted in: Installation | Online Monitoring system | Write ups | Application | General Information | Introduction | Self-Cleaning System | Tiaano | E-surveyor

Tags: , , , , ,

Special Characteristics of Tiaano’s Chemical Free Electrolytic Scale Remover used for Cooling Tower Water Treatment System

October 14, 2019 at 4:40 PMadmin
Indian engineering & production follows science & Technology of Israel. [More]

PERFORMANCE REPORT ON TIAANO’S CHEMICAL FREE ELECTROLYTIC SCALE REMOVER GIVEN BY M/S. ISRO on HOT WATER TREATMENT SYSTEM

October 10, 2019 at 5:56 PMadmin
During this 650 Hrs. treatment, the ElSr system protects corrosion on the wall of the HWCS Tank. Also removed the existing scale (fouling) on the Heater coil. Hence the Tiaano’s ElSr system can separates the scale accumulated on the accessories like Heater, Condenser, Hot water circuits and makes corrosion free. [More]

Tiaano’s Chemical Free Electrolytic Scale Remover Installation in Textile Mills for the Application of Humidification Spray Chamber

October 9, 2019 at 5:35 PMadmin
ue to the recirculation of water in the process, all the conductive salts (scale) deposited in the Pipe lines & the Spray nozzles. In due course the pipelines are getting deteriorated. [More]

A Project Profile for Tiaano’s Chemical Free Electrolytic Scale Remover

September 28, 2019 at 6:29 PMadmin
To maintain the Delta-T, they used the traditional anti-scaling dozing. Due to the scarcity of water, blow down was restricted. Now after using ‘Tiaano ElSr – Ct’ series, blow down was restricted. [More]

PERFORMANCE ON TIAANO'S CHEMICAL FREE ELECTROLYTIC SCALE REMOVER BY M/S. AAVIN, MADHAVARAM, CHENNAI

September 19, 2019 at 5:59 PMadmin
PERFORMANCE REPORT ON TIAANO’S CHEMICAL FREE ELECTROLYTIC SCALE REMOVER, BY M/S. AAVIN TAMILNADU, MADHAVARAM, CHENNAI. Project: Tamil Nadu Co-operative Milk Producers’ Federation (TCMPF) was formed in February’1981, to manage the activities such as milk procurement, storage, processing and marketing of the milk and milk products. They believes that our Country’s socio-economic development in connect with the development of rural India. The TCMPF Limited is an apex body of 17 District Cooperative Milk Producers' Unions. It is headquartered located at Aavin Illam, Madhavaram, Chennai and has four dairy plants in Chennai. Application:  Depending on the atmospheric temperature, Milk enters the receival vat between 80° F. and 98° F., and ideally it should be cooled immediately to about 40° F. to reduce the activity of the bacteria. Most of the plants do not have refrigeration system and cooling is done by passing the milk over a washboard type of coo... [More]

Posted in: Dairy Industry | Dis-infection | Installation | Case Study | cooling tower | Tiaano

Tags:

Chemical Free Portable / Dip Electrolytic Scale Remover Installation at Jaipur

September 17, 2019 at 6:41 PMadmin
We Tiaano Successfully Completed a Portable Scale Remover Installation at Jaipur On Sep, 2019. [More]

Posted in: Dis-infection | Installation | Photo Gallery | Bio-fouling | cooling tower | General Information | Tiaano

Tags: , , , , , , ,

How we ensure 20% of water feed through Tiaano ElSr?

September 14, 2019 at 12:29 PMadmin
20% of the water in circulation from the main stream will be tapped to our ElSr through non-destructive ultrasonic flow meter as an installation tool. By using this tool, control valve shall be adjusted [More]

Posted in: Installation | Application | Case Study | cooling tower | FAQ | General Information | Tiaano

Tags: , , , , , , , ,